Cambridge ALD: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 51: | Line 51: | ||
* [https://www.youtube.com/watch?v=GmNEbyMNC4A Click here to watch the video on YouTube] | * [https://www.youtube.com/watch?v=GmNEbyMNC4A Click here to watch the video on YouTube] | ||
* Log the base pressure on the Excel notebook. | |||
* Open valve on top of the nitrogen bottle. | * Open valve on top of the nitrogen bottle. | ||
* Check nitrogen bottle pressure | * Check the nitrogen bottle pressure: | ||
*: If line pressure is outside of range, carefully adjust the regulator valve with the flow set to 20 sccm. | ** Main bottle pressure should be at least 5 bar | ||
** Line pressure >1 bar (ALD1) 1-2 bar (ALD2). | |||
*: ''If line pressure is outside of range, carefully adjust the regulator valve with the flow set to 20 sccm.'' | |||
* Make sure the valves of '''all''' precursors inside the ALD machine are closed. | * Make sure the valves of '''all''' precursors inside the ALD machine are closed. | ||
* Run recipe ''Default_cleaning'' to pump out any residual gas in the gas lines. | * Run recipe ''Default_cleaning'' to pump out any residual gas in the gas lines. | ||
*: With flow set to 0 the actual flow can be between 0-1 sccm. | *: With flow set to 0 the actual flow can be between 0-1 sccm. | ||
* Press the ''VENT'' or ''VENT REACTOR'' button. | * Press the '''VENT''' or '''VENT REACTOR''' button. | ||
* Open the metal lid. | * Open the metal lid. | ||
* Put your sample inside, roughly in the center, away from the gas inlet and outlet. | * Put your sample inside, roughly in the center, away from the gas inlet and outlet. | ||
*: Check whether the rubber O-ring is properly seated. | *: Check whether the rubber O-ring is properly seated. | ||
* Close the metal lid. Check that the lid is aligned to sit directly on top of the reactor chamber. | * Close the metal lid. Check that the lid is aligned to sit directly on top of the reactor chamber. | ||
* Press the | * Press the '''PUMP''' or '''PUMP REACTOR''' button. | ||
*: Pressure with flow set to 0: ~5e-2 Torr or lower. | *: Pressure with flow set to 0: ~5e-2 Torr or lower. | ||
* Place the metal cage on top of the tool. | * Place the metal cage on top of the tool. | ||
* Open relevant precursor valves. | * Open relevant precursor valves. | ||
* Run your recipe. | * Run your recipe. | ||
* | <blockquote style="background-color: #F0F0F0; border: dashed thin grey;"> | ||
* | * Pressure with 20 sccm N<sub>2</sub> flow present: low e-1 Torr. | ||
* | * ALD1 pulse lengths: H<sub>2</sub>O ~0.5 s, HfOx TDMAH 0.2 s, AlOx TMA 0.02 s. | ||
* ALD2 pulse lengths: H<sub>2</sub>O ~0.02 s, HfOx TDMAH 0.2-0.5 s. | |||
</blockquote> | |||
* Close precursor valves. | * Close precursor valves. | ||
* Press the big round ''VENT'' or ''VENT REACTOR'' button. | * Press the big round '''VENT''' or '''VENT REACTOR''' button. | ||
* Place the metal cage on the side of the tool. | * Place the metal cage on the side of the tool. | ||
* Take out your sample. Check the rubber o-ring. | * Take out your sample. Check the rubber o-ring. | ||
* Press the big round ''PUMP'' or ''PUMP REACTOR'' button. | * Press the big round '''PUMP''' or '''PUMP REACTOR''' button. | ||
* Close the nitrogen bottle valve on top of the bottle. | * Close the nitrogen bottle valve on top of the bottle. | ||
* Run recipe ''Default_heater_set''. | * Run recipe ''Default_heater_set''. |
Revision as of 11:50, 12 September 2024
![]() | |
Essentials | |
---|---|
Full name | Savannah S100 (gen. 1) |
Manufacturer | Cambridge NanoTech (Veeco) |
Description | Atomic layer deposition system |
Location | Cleanroom 1 (03.2.209A) Cleanroom 2 (03.2.203B) |
Responsibility | |
Primary | Martin |
Secondary | Smitha |
Two nearly identical Savannah S100-like systems are used for atomic layer deposition of aluminum oxide and hafnium oxide.
Other material deposition alternatives at the NBI cleanroom:
- AJA systems for sputtering/e-gun evaporation
- E-Gun evaporator
- Edwards thermal evaporator
- Leica sputter coater
- Molecular beam epitaxy system
Growth per cycle (GPC) monitoring
-
ALD1 HfOx
-
ALD2 HfOx
Available processes
Deposited material | Precursor | ALD1 | ALD2 | Ref. |
---|---|---|---|---|
Hafnium oxide (HfOx, HfO2) | Yes | Yes | [1] | |
Aluminum oxide (AlOx, Al2O3) | Yes | Yes | [2] |
Standard operating procedure
Video on how to operate ALD 1:
Video on how to operate ALD 2:
- Log the base pressure on the Excel notebook.
- Open valve on top of the nitrogen bottle.
- Check the nitrogen bottle pressure:
- Main bottle pressure should be at least 5 bar
- Line pressure >1 bar (ALD1) 1-2 bar (ALD2).
- If line pressure is outside of range, carefully adjust the regulator valve with the flow set to 20 sccm.
- Make sure the valves of all precursors inside the ALD machine are closed.
- Run recipe Default_cleaning to pump out any residual gas in the gas lines.
- With flow set to 0 the actual flow can be between 0-1 sccm.
- Press the VENT or VENT REACTOR button.
- Open the metal lid.
- Put your sample inside, roughly in the center, away from the gas inlet and outlet.
- Check whether the rubber O-ring is properly seated.
- Close the metal lid. Check that the lid is aligned to sit directly on top of the reactor chamber.
- Press the PUMP or PUMP REACTOR button.
- Pressure with flow set to 0: ~5e-2 Torr or lower.
- Place the metal cage on top of the tool.
- Open relevant precursor valves.
- Run your recipe.
- Pressure with 20 sccm N2 flow present: low e-1 Torr.
- ALD1 pulse lengths: H2O ~0.5 s, HfOx TDMAH 0.2 s, AlOx TMA 0.02 s.
- ALD2 pulse lengths: H2O ~0.02 s, HfOx TDMAH 0.2-0.5 s.
- Close precursor valves.
- Press the big round VENT or VENT REACTOR button.
- Place the metal cage on the side of the tool.
- Take out your sample. Check the rubber o-ring.
- Press the big round PUMP or PUMP REACTOR button.
- Close the nitrogen bottle valve on top of the bottle.
- Run recipe Default_heater_set.
Technical notes
- Recipe file location
- ALD1: C:\Savannah\Users\Standard\
- ALD2: C:\Cambridge Nanotech\Recipes\
- Log file location
- ALD1: C:\ALD data. Includes pressure data, screenshot at termination.
- ALD2: C:\Cambridge Nanotech\Log\. Includes pressure and heater temperature data, screenshot at termination, software event logs.
Troubleshooting
- Pressure reading obviously wrong (above 1e3 Torr or below 1e-4 Torr)
- Pressure gauge failure. Unplug the network cable from the small square pressure gauge beneath the chamber and plug it back in. The pressure reading should return to expected values.
- No peak visible during precursor pulse
-
- Precursor valves closed. Make sure the relevant precursor valves are open. Consult the labels on the inside of the door.
- Pulse time too short. Select the lowest plotting interval and check whether you can spot a small peak when the automatic valve opens. Increase pulse time as needed.
- Cannot open lid upon venting
-
- Chamber pressure still below atmosphere. Confirm pressure reading in software. If pressure is below 5e2 Torr, check whether the nitrogen bottle valve is open.
- Rubber O-ring can get stuck to the lid. Gently but firmly lift the lid. Reseat the O-ring if needed.
Remote access
- TeamViewer: ALD1, ALD2
- LogMeIn: ALD1 (CR1), ALD2 (CR2)