AJA service

From cleanroom
Revision as of 14:33, 18 June 2026 by Harry (talk | contribs) (Created page with "AJA systems maintenance is described here == Maintenance == === Standard maintenance === # Log cryo temp, base pressure. # Close cryo gate valve. # Turn off ion gauge. # Open loadlock gate valve. # Turn off loadlock turbo. #: While venting: #* Unscrew right port with the linear crucible drive using two 9/16" wrenches. #* Unscrew lid if you intend to open it. #* Above 1e0 Torr loadlock pressure slowly open the vent nitrogen needle valve in front of the chamber. # A...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

AJA systems maintenance is described here

Maintenance

Standard maintenance

  1. Log cryo temp, base pressure.
  2. Close cryo gate valve.
  3. Turn off ion gauge.
  4. Open loadlock gate valve.
  5. Turn off loadlock turbo.
    While venting:
    • Unscrew right port with the linear crucible drive using two 9/16" wrenches.
    • Unscrew lid if you intend to open it.
    • Above 1e0 Torr loadlock pressure slowly open the vent nitrogen needle valve in front of the chamber.
  6. At atmosphere: start stopwatch.
  7. Pull out right port, open e-beam shutter.
  8. For each crucible:
    • Wipe target metal surface with wipe
    • Weigh with digital scale
      • W crucible weighs ~120 g
      • Intermetallic crucible ~20 g
      • FabMate crucible ~12 g
      • Gold pellets <80 g, 40-45 g for half
      • Al pellets 6-7 g
      • Top up target material if needed, log amount.
  9. If Sensor Life < 70% change the QCM. You can do this by sticking your hand through the loadlock. Be careful not to touch the mirror.
    • AJA1: gold plated 6 MHz. There are two. Sensor 2 is towards the end of the assembly. It is a bit tricky to get out, even with the sensor shutter open.
    • AJA2: silver plated 6 MHz (doesn't fail immediately during Pt evaporation)
  10. Push the linear drive back inside, screw the nuts back on the bolts
  11. Check if you can see the crucible in the mirror. If not:
    1. Attach chain to only one lid hook. Pull with ceiling motor for 20 mins
    2. Once the lid is open then lower the lid and lift with all three hooks
    3. Check if the quarter silicon wafer has started to delaminate. If so, peel off and reuse if possible. If it is not reflective enough, replace with clean quarter wafer.
    4. Adjust the clamp holding the mirror so that you can see the crucible through the port with LED light.
    5. Close lid, do not tighten screws/nuts
  12. Start pumping, log time at atmosphere, tighten the nuts on the crucible linear drive
  13. Close vent needle valve (not too tight!)
  14. If loadlock pressure goes below 1e-1 Torr, there are no obvious leaks
  15. After 30-60 mins check pressure. If <1e-4 Torr, turn on ion gauge
  16. Open cryo gate valve at own discretion. Turbo helps pumping down to ~1e-6 Torr. At lower pressures loadlock gate valve should be closed and only cryo should be open to the main chamber.
  17. Write a message to the users!

Cryo pump regeneration

  1. Close cryo VAT valve ( Adaptive pressure controller ) .
  2. Open the loadloack valve.
  3. Open Turbo is pumping the main chamber
  4. Turn off cryo (on the wall behind the tool). Just press and release switch .
  5. Open nitrogen vent valve on the back left of the cryo.
  6. Let warm to max T (~285 K), takes ~1 hour
  7. Close nitrogen vent valve
  8. Close roughing pump to turbo (screw valve under the loadlock turbo)
  9. Open roughing to cryo (screw valve next to cryo)
  10. Wait 20 mins to rough pump cryo
  11. Open roughing to turbo
  12. Turn on cryo ( wall switch) . Please check compressor as well .
  13. Wait ~60 mins to get between 200-150 K
  14. Close roughing to cryo
  15. Wait until min T. Must be below 20 K (2-3 hours at 2 K/min)
    If does not go down below 20 K, replace cryo with spare unit. Return cryo for repair/refurb to Edwards Vacuum. Contacts on the internal QDev wiki
  16. Close loadlock
  17. Open cryo VAT valve

Special notes

The standard Phase II J software configurations on the systems are:


AJA1 standard config AJA1

AJA2 standard config AJA2

  • If you are unable to ignite the plasma (either DC, RF or ion plasma) start by checking for shorts between pins on the powersupply input on the sputtering arm / ion source.