Created page with "AJA systems maintenance is described here == Maintenance == === Standard maintenance === # Log cryo temp, base pressure. # Close cryo gate valve. # Turn off ion gauge. # Open loadlock gate valve. # Turn off loadlock turbo. #: While venting: #* Unscrew right port with the linear crucible drive using two 9/16" wrenches. #* Unscrew lid if you intend to open it. #* Above 1e0 Torr loadlock pressure slowly open the vent nitrogen needle valve in front of the chamber. # A..." |
|||
| Line 1: | Line 1: | ||
[[AJA systems]] maintenance is described here | [[AJA systems]] maintenance is described here | ||
= Maintenance = | |||
== Standard maintenance == | |||
# Log cryo temp, base pressure. | # Log cryo temp, base pressure. | ||
| Line 42: | Line 42: | ||
# Write a message to the users! | # Write a message to the users! | ||
== Cryo pump regeneration == | |||
# Close cryo VAT valve ( Adaptive pressure controller ) . | # Close cryo VAT valve ( Adaptive pressure controller ) . | ||
| Line 63: | Line 63: | ||
# Open cryo VAT valve | # Open cryo VAT valve | ||
== | == Phase II J software configurations == | ||
The standard Phase II J software configurations on the systems are: | The standard Phase II J software configurations on the systems are: | ||
| Line 75: | Line 75: | ||
[[Image:Aja2setup.jpg|600px|standard config AJA2]] | [[Image:Aja2setup.jpg|600px|standard config AJA2]] | ||
=Troubleshooting= | |||
* If you are unable to ignite the plasma (either DC, RF or ion plasma) start by checking for shorts between pins on the powersupply input on the sputtering arm / ion source. | * If you are unable to ignite the plasma (either DC, RF or ion plasma) start by checking for shorts between pins on the powersupply input on the sputtering arm / ion source. | ||
Revision as of 14:34, 18 June 2026
AJA systems maintenance is described here
Maintenance
Standard maintenance
- Log cryo temp, base pressure.
- Close cryo gate valve.
- Turn off ion gauge.
- Open loadlock gate valve.
- Turn off loadlock turbo.
- While venting:
- Unscrew right port with the linear crucible drive using two 9/16" wrenches.
- Unscrew lid if you intend to open it.
- Above 1e0 Torr loadlock pressure slowly open the vent nitrogen needle valve in front of the chamber.
- At atmosphere: start stopwatch.
- Pull out right port, open e-beam shutter.
- For each crucible:
- Wipe target metal surface with wipe
- Weigh with digital scale
- W crucible weighs ~120 g
- Intermetallic crucible ~20 g
- FabMate crucible ~12 g
- Gold pellets <80 g, 40-45 g for half
- Al pellets 6-7 g
- Top up target material if needed, log amount.
- If Sensor Life < 70% change the QCM. You can do this by sticking your hand through the loadlock. Be careful not to touch the mirror.
- AJA1: gold plated 6 MHz. There are two. Sensor 2 is towards the end of the assembly. It is a bit tricky to get out, even with the sensor shutter open.
- AJA2: silver plated 6 MHz (doesn't fail immediately during Pt evaporation)
- Push the linear drive back inside, screw the nuts back on the bolts
- Check if you can see the crucible in the mirror. If not:
- Attach chain to only one lid hook. Pull with ceiling motor for 20 mins
- Once the lid is open then lower the lid and lift with all three hooks
- Check if the quarter silicon wafer has started to delaminate. If so, peel off and reuse if possible. If it is not reflective enough, replace with clean quarter wafer.
- Adjust the clamp holding the mirror so that you can see the crucible through the port with LED light.
- Close lid, do not tighten screws/nuts
- Start pumping, log time at atmosphere, tighten the nuts on the crucible linear drive
- Close vent needle valve (not too tight!)
- If loadlock pressure goes below 1e-1 Torr, there are no obvious leaks
- After 30-60 mins check pressure. If <1e-4 Torr, turn on ion gauge
- Open cryo gate valve at own discretion. Turbo helps pumping down to ~1e-6 Torr. At lower pressures loadlock gate valve should be closed and only cryo should be open to the main chamber.
- Write a message to the users!
Cryo pump regeneration
- Close cryo VAT valve ( Adaptive pressure controller ) .
- Open the loadloack valve.
- Open Turbo is pumping the main chamber
- Turn off cryo (on the wall behind the tool). Just press and release switch .
- Open nitrogen vent valve on the back left of the cryo.
- Let warm to max T (~285 K), takes ~1 hour
- Close nitrogen vent valve
- Close roughing pump to turbo (screw valve under the loadlock turbo)
- Open roughing to cryo (screw valve next to cryo)
- Wait 20 mins to rough pump cryo
- Open roughing to turbo
- Turn on cryo ( wall switch) . Please check compressor as well .
- Wait ~60 mins to get between 200-150 K
- Close roughing to cryo
- Wait until min T. Must be below 20 K (2-3 hours at 2 K/min)
- If does not go down below 20 K, replace cryo with spare unit. Return cryo for repair/refurb to Edwards Vacuum. Contacts on the internal QDev wiki
- Close loadlock
- Open cryo VAT valve
Phase II J software configurations
The standard Phase II J software configurations on the systems are:
Troubleshooting
- If you are unable to ignite the plasma (either DC, RF or ion plasma) start by checking for shorts between pins on the powersupply input on the sputtering arm / ion source.