E-Gun evaporator: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 25: | Line 25: | ||
# Open vent valve on loadlock (LL). The pressure gauge for the LL should now read about 760 Torr or ''or'' (over range) | # Open vent valve on loadlock (LL). The pressure gauge for the LL should now read about 760 Torr or ''or'' (over range) | ||
# Remove the sample holder | # Remove the sample holder | ||
== Loading sample/pumping down the loadlock == | |||
# Mount the sample on the holder and secure the holder in the top position | |||
# Close the vent valve | |||
# Close the roughing pump valve (RV). A warning signal for close RV starts | |||
# Open the sample valve (SV). Watch the LL pressure on the gauge. | |||
# When the LL pressure is < 8×10<sup>-2</sup> torr, open RV again | |||
# When the LL pressure is < 5×10<sup>-2</sup> torr, close SV. Watch for a fast rise in the LL pressure! This is a sign of a leak. | |||
# Open GV before LL pressure rises to > 8×10<sup>-2</sup> torr | |||
# '''Gently''' lower the sample holder into the chamber |
Revision as of 13:27, 2 December 2016
Overview
The e-gun evaporator, also known as Egon, is a homegrown electron beam physical vapor deposition system.
Operating instructions
Unloading sample/Venting loadlock
Prerequisites:
- Sample holder must be in the top position
- The gate valve (GV) must be closed
- The sample valve (SV) to the roughing pump must be closed
Then:
- Open vent valve on loadlock (LL). The pressure gauge for the LL should now read about 760 Torr or or (over range)
- Remove the sample holder
Loading sample/pumping down the loadlock
- Mount the sample on the holder and secure the holder in the top position
- Close the vent valve
- Close the roughing pump valve (RV). A warning signal for close RV starts
- Open the sample valve (SV). Watch the LL pressure on the gauge.
- When the LL pressure is < 8×10-2 torr, open RV again
- When the LL pressure is < 5×10-2 torr, close SV. Watch for a fast rise in the LL pressure! This is a sign of a leak.
- Open GV before LL pressure rises to > 8×10-2 torr
- Gently lower the sample holder into the chamber