Plassys Evaporator: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Infobox tool | |||
|image = Tools Plassys.jpg | |||
|toolfullname = MEB550S | |||
|website = https://plassys.com/ | |||
|company = Plassys | |||
|description = Evaporation system | |||
|location = 1st floor lab (03.2.213) | |||
|primary = Harry | |||
|secondary = Martin | |||
}} | |||
= Overview = | = Overview = | ||
Physical vapour deposition tool of aluminium via e-beam evaporation for Josephson junction fabrication. | Physical vapour deposition tool of aluminium via e-beam evaporation for Josephson junction fabrication. | ||
Line 56: | Line 67: | ||
# Use the dedicated screwdriver to loosen the three main screws | # Use the dedicated screwdriver to loosen the three main screws | ||
# Rotate the holder to release it from the main stage. | # Rotate the holder to release it from the main stage. | ||
# Place the holder on a cleanroom wipe on the | # Place the holder on a cleanroom wipe on the table | ||
# Close the LL lid | # Close the LL lid | ||
# Clamp your substrate to the holder. There are many available holders. Use the one that your group recommends. | # Clamp your substrate to the holder. There are many available holders. Use the one that your group recommends. | ||
Line 97: | Line 108: | ||
==Sample unloading== | ==Sample unloading== | ||
# Accept the ''Process complete'' pop-up message | |||
# Turn off the Carrera power supply, Kaufman controller, and close the valces of the gas bottles | |||
# On the <code>- LL state -</code> side of the user interface click <code>VENT</code> | |||
# Wait for the load lock to vent. | |||
#:''The venting is complete when you stop hearing the hissing sound of the N2 line'' | |||
# Wear gloves. Sleeves and hair net are also recommended. | |||
# Use the stepping stool to have better access to the loadlock | |||
#:'' Be careful with the ventilation unit above the tool'' | |||
# Open the loadlock lid | |||
# Use the dedicated screwdriver to loosen the three main screws | |||
# Rotate the holder to release it from the main stage. | |||
# Place the holder on a cleanroom wipe on the table | |||
# Close the LL lid | |||
# Remove your chip from the holder. | |||
# Wipe the holder with ethanol | |||
# Place the holder back into the loadlock. | |||
#: If you used a holder from your own group, then place your holder back into the descicator and load the holder that was initially in the chamber. | |||
# Align the holder pin with the pin in the chamber. | |||
# Tighten the screws with the dedicated screwdriver and place it back in its holder. | |||
# On the <code>- LL state -</code> side of the user interface, click <code>PUMP</code> | |||
#: The loadock will start pumping first with the scroll pump (up to 1e-1 bar) and then with the turbopump. | |||
#: '''Verify that the load lock is pumping down''' | |||
# Go to <code>File</code> and '''Log off''' | |||
# Verify that '''the surfaces are tidy, there are no excess wipes on the table and you left no samples or sample boxes behind'''. |
Latest revision as of 08:49, 10 September 2025
![]() | |
Essentials | |
---|---|
Full name | MEB550S |
Manufacturer | Plassys |
Description | Evaporation system |
Location | 1st floor lab (03.2.213) |
Responsibility | |
Primary | Harry |
Secondary | Martin |
Overview
Physical vapour deposition tool of aluminium via e-beam evaporation for Josephson junction fabrication.
It also provides an ion gun for surface preparation and etching purposes.
The system has the capability of in-situ oxidation.
The sample stage can be cooled with LN2.
Film Quality: Surface roughness - 1.6 nm for 100nm thick film ( scan area 2 um /AFM Analysis (June 2023)
Currently loaded materials
Crucible position | Material | Comment |
---|---|---|
1 | Ti | Currently In Use |
2 | - | Empty |
3 | - | Empty |
4 | Al | NBI crucible |
5 | Al | NQCP crucible |
Substrates allowed
- Silicon and Sapphire only
- III/V substrates are not allowed in the chamber
Standard Operating Procedure
This is the standard operating procedure for the Plassys evaporator at the process lab on the second floor.
Pre-checks and log in
Pre-checks
- Is the oxygen alarm beeping?
- Leave the room immediately and notify the cleanroom staff
- Log the loadlock and main chamber pressures in the Excel log sheet at the external computer.
- PLL ~ 1e-7 bar
- Pmain < 5e-8 bar
- Verify that the turbopump and the cryopump are both running (check main software interface)
- Turbo should be running on 100% speed
- Tcryo should be in the range 12-15 K
- Verify that nobody has loaded a sample and that no user is logged on
Log in
- Click on the
logged off
indication of the GUI and use your group's credentials to log in
Sample loading
- On the
- LL state -
side of the user interface clickVENT
- Wait for the load lock to vent.
- The venting is complete when you stop hearing the hissing sound of the N2 line
- Wear gloves. Sleeves and hair net are also recommended.
- Use the stepping stool to have better access to the loadlock
- Be careful with the ventilation unit above the tool
- Open the loadlock lid
- Use the dedicated screwdriver to loosen the three main screws
- Rotate the holder to release it from the main stage.
- Place the holder on a cleanroom wipe on the table
- Close the LL lid
- Clamp your substrate to the holder. There are many available holders. Use the one that your group recommends.
- Keep the unused holders in the N2 desiccator
- Align the holder pin with the pin in the chamber. This will help you with any angled evaporations.
- Tighten the screws with the dedicated screwdriver and place it back in its holder.
- On the
- LL state -
side of the user interface, clickPUMP
- The loadock will start pumping first with the scroll pump (up to 1e-1 bar) and then with the turbopump.
Load your recipe
While the loadlock is pumping down, you can prepare your recipe
- Click on the Edit process icon
File > Open recipe> ...
Choose from your group folde- Edit the main parameters such as time, thickness, and tilt
- Save the recipe
- On the saved recipe name you automatically get the date added
- Close the window
Excecute your recipe
- Are you doing evaporation?
- Turn on the Carrera power supply
- Are you doing milling?
- Turn on the Kaufman control unit and open the valve of the argon bottle
- Are you doing oxidation?
- Verify that the oxygen bottle valve is open
- Click on the Run process icon
- Load your recipe
- Verify all your steps
- Click
Execute
Monitor your process
- Do not leave the system unattended
- During your process, you will be asked multiple times to check that the system is in the correct state and you need to be present to aknowledge these messages
- Keep the viewport shutter always closed
- There is a polariser filter on the viewport that you can use when the crucible is bright. See the indications about the positioning of the polariser (transparent vs opaque)
Sample unloading
- Accept the Process complete pop-up message
- Turn off the Carrera power supply, Kaufman controller, and close the valces of the gas bottles
- On the
- LL state -
side of the user interface clickVENT
- Wait for the load lock to vent.
- The venting is complete when you stop hearing the hissing sound of the N2 line
- Wear gloves. Sleeves and hair net are also recommended.
- Use the stepping stool to have better access to the loadlock
- Be careful with the ventilation unit above the tool
- Open the loadlock lid
- Use the dedicated screwdriver to loosen the three main screws
- Rotate the holder to release it from the main stage.
- Place the holder on a cleanroom wipe on the table
- Close the LL lid
- Remove your chip from the holder.
- Wipe the holder with ethanol
- Place the holder back into the loadlock.
- If you used a holder from your own group, then place your holder back into the descicator and load the holder that was initially in the chamber.
- Align the holder pin with the pin in the chamber.
- Tighten the screws with the dedicated screwdriver and place it back in its holder.
- On the
- LL state -
side of the user interface, clickPUMP
- The loadock will start pumping first with the scroll pump (up to 1e-1 bar) and then with the turbopump.
- Verify that the load lock is pumping down
- Go to
File
and Log off - Verify that the surfaces are tidy, there are no excess wipes on the table and you left no samples or sample boxes behind.